-
CCTV Installation
-
Control4 wireless smart switch installation
-
- Join this Course to access resources
- Quiz
-
- Join this Course to access resources
- Quiz
-
- Join this Course to access resources
- Quiz
-
- Join this Course to access resources
- Quiz
-
-
Pre-wiring & pairing for motorised shade integration
-
- Join this Course to access resources
- Quiz
-
- Join this Course to access resources
-
-
Control4 Touch Screen Installation
-
- Join this Course to access resources
- Quiz
-
Verifying the outgoing current in load 1 and load 2
Verifying the outgoing current for load 1 and 2 is to confirm that the connected loads (Load 1 and Load 2) are receiving power from the switch output terminals, ensuring proper wiring and functionality of the controlled devices.
Rating
0
0
There are no comments for now.
Join this Course
to be the first to leave a comment.
Share This Content
Share Link
Share on Social Media
Share by Email
Please login to share this Video by email.